Irrigation Land with a small Solar generation facility, Palmdale CA
Prepared Existing Site Plan which included the mapping of existing parcels, easements, waterways, street right of way, topography, land use, protected areas, flood map check, and preliminary regulatory assessment. Also, helped our client in developing a conceptual site plan for the 10,000-gallon water tank and 1kW solar power site to power the irrigation.
Services Provided
Site Planning
Topography study Protected areas identification
Flood map check
Preliminary regulatory assessment.